Operation Occupy the Machine Shop

With the semester coming to a close, the manufacturing stage has been in full swing for Carnegie Mellon Racing. We have been working non-stop on finalizing designs, ordering parts, and machining. Check out the awesome chassis that has developed in the garage as a result.

CNC work has also begun with suspension and diff components, while engine modifications are now being carried out to lighten our oil pan. Although we’ve had an aggressive timeline, everyone has been striving to meet our goals by winter break.

Shown here is the chassis and the diff, along with some sweet scale model testing being conducted by the fuel system team regarding baffle effectiveness.

Bookmark the permalink.

Comments are closed